Amigurumi Bunny Doll Pattern

 Click For Crochet Abbreviations List

For a bunny we need:
-White yarn (preferably YarnArt Jeans, Alize Cotton Gold)
-Hollofayber
-Eye 8 mm
-Yarn for the dress and shoe (for the dress you can take acrylic, for shoe-harder to keep the form)
-Cotton thread for the embroidery of thin cilia
-Hook 2.5
-Needle for stitching yarn
-Scissors
-marker, in order to keep up with the account (optional)
Bunny comes out with a growth of about 30-32 cm of yarn, which I advised.

Step 1. Head:
1 row: 6 PRS in the ring
2 row: 6 d. 12
3 row: (1 prs, D) * 6 (18)
4 row: 1 PRS, D, (2 PRS, D) * 5, 1 PRS (24)
5 row: (3 prs, D) * 6 (30)
6 row: 2 PRS, D, (4 PRS, D) * 5, 2 PRS (36)
7 row: (5 prs, D) * 6 (42)
8 row: 3 PRS, D, (6 PRS, D) * 5, 3 PRS (48)
9-21 Series: 48 PRS
22 row: (6 PRS, UB) * 6 (42)
23 Row: (5 PRS, UB) * 6 (36)
24 row: (4 PRS, UB) * 6 (30)
25 Row: (3 PRS, UB) * 6 (24)
26 Row: (4 PRS, UB) * 4 (20)
Leave the tip for the sewing head 35-40 cm.
(!!!) If you will glue eyes (instead of inserting), I advise to do it at the very end, that once again they do not injure.
The distance between the eyes-7 PRS.
I advise first to insert safe needles, and then to embroider on 3 cilia for each eye. And then, slightly entering the eyelashes, to glue the eyes. I will use scissors, glue at the moment gel.
Embroider the spout with a gentle pink thread on the next row under the eyes.
Experimentally, we came to the fact that if crochet of yarn yarart Jeans or Alize Cotton Gold, you can directly knit up to 18-19 series. The main thing, that formed a round ball, as in the photo. It also depends on the density of your knitting.
Step 2. Ears (2 parts):
1 row: 6 PRS in the ring
2 row: (1 prs, D) * 3 (9)
3 row: (2 prs, D) * 3 (12)
4 Row: 12 PRS
5 row: (2 prs, D) * 4 (16)
6-18 Series: 16 PRS
19 Row: (2 PRS, UB) * 4 (12)
20 Row: 12 PRS
Leave a thread long enough to sew the ears napoplam and sew to the head. I sew on the 3-4 row.

Step 3. Bow on the ear:
Bow: 18 VP + 1 VP for lifting
1 row: PRS (18)
2 row: PRS (18)
Sew, wraps yarn in the center, sew to ear.
Step 4. Hands (2 details):
1 row: 5 PRS in the ring
2 row: 5 D. 10
3-25 Rows: 10 PRS (10)
The Nibivaem is loose, so that the handles are kept in shape.
Step 5. Boots + legs (2 parts):
We begin to knit color boots.
1 row: Dial A chain of 6 VP starting with the second loop from the hook: 4 PRS, 3 PRS in
The last loop. On the other side of the chain: 3 PRS, 3 PRS in the last
Loop (13)
2 row: 4 PRS, OL per track. 3 loops, 3 PRS, D in the track. 3 Loops (19)
3 row: 6 PRS, 3 ol, 7 PRS, 3 ol (25)
4-7 Series: 25 PRS
8 row: 4 PRS, 6 UB, 9 PRS (19)
9 row: 4 PRS, 3 UB, 5 PRS (16)
10-15 Series: PRs in a circle (16)
It’s a tie. Then another DOVJAZYVAEM 3 PRS, that the end of the series was the back of the legs in the center.
16 row: Knit for the front wall PRS (16)
17 Row: Oblige Lobster Step so: 2 VP, with track. Loops begin to make a binding lobster a step, at the end pull a hook from a hinge (SM photo 1, 2, 3 👇 below), we wind it in the 2nd C. P (which we did at the beginning), Zacepljaem the loop of the last column, and deduce it through the 2nd Air loop, fasten, cut the thread, Hide it inside the boots with a needle. 16
Fills.
Continue to knit body color:
Away top boots for the convenience of further knitting.
18 row: Knit behind the back loops and make 2 kills in any places (14)
19-38 Series: 14 PRS (14)
Step 6. Torso:
3 air loops between the legs, connect, further knit in a circle:
1 row: 34 PRS
2 row: 6 PRS, D, 8 PRs, D, 8 PRs, D, 9 PRS (37)
3-8 Series: 37 PRS (37)
9 row: 4 PRS, UB, 5 PRS, UB, 4 PRS, UB, 5 PRS, UB, 4 PRS, UB, 5 PRS, UB (31)
11-13 Series: 31 PRS
14 Row: (4 PRS, UB.) * 5 (26)
15 Row: 26 PRS
16 Row: (3 PRS, UB.) * 6 (20)
17-21 Series: 20 PRS
Fills. Sew the head to the torso.
Sew the handles to approximately 18 row of the torso.
Step 7. Dress:
1 row: 39 EAP, make the SS (connecting column) in the 10th loop from the hook, Dial 3 vp and untie 29 PRSs.
2.3 EAP, (1 PRSs, D) * 15 (45)
3.1 VP, PRS to the end of the series (45)
4. VP, change color, 6 PRS, 10 VP, skip 8 PRs and untie PRS in 9, 17 PRS, 10 VP, skip 8 PRS, 6 PRS
5.3 EAP, 6 PRSs, 13 PRSs in the EAP series, 17 PRSs, 13 PRSs in the EAP, 6 PRSs
6.3 EAP, raise every 5 PRSs (64) to connect to the ring using SS
7-13.64 PRSs
14. Strapping lobster Step.
Girls, because we all knitted of different yarn, and all different density of knitting, then ourself dress on his bunny. You may need to dial a chain from the EAP longer, or shorter. and also in the 5th row I have got into a chain from the EAP 13 PRSs, you can do less, if frock already will sit well.
Just along the length of the Guide to your bunny. I knit a cotton dress that is thinner than jarnart jeans.

Similar Posts